These pictures of the basement were taken the weekend of 09-26-2015 and Monday after. After a couple of issues with the rough-in inspection were fixed during the week, this weekend, drywall installation began! We got Masons room completed (except for the closet ceiling), and started the mud and taping Beths room is ready for mud and tape. The lower portion of most of the other walls, as well as almost all the ceiling is drywalled.